top of page
Project images with overlay for page headers_Gray.png

SHARING OUR EXPERTISE

Life Sciences

SCIENCE & TECHNOLOGY

Our Experience

Confidential Client Master Planning

  • We worked with this confidential manufacturing company on the development of an eco-friendly master plan to reposition an existing facility as a world-class biotech campus including offices, laboratories, research, manufacturing, and warehouse facilities. The campus also includes a multilevel above ground car parking building with spaces for 1,000 cars.

 

  • Our initial work included preparing a program validation document, with an evaluation of block loads provided by the client to inform the rough order of magnitude equipment sizes.

  • We also provided descriptions and block layouts for: on-site power generation; co generation of power/mechanical heating and cooling systems; energy storage and energy recovery; on-site fuel oil and natural gas propane with high-level comparison; potable and non-potable water treatment and storage; gray water and black water collection and reuse; single vs multiple CUPs (Central Utility Plants) with estimated volume requirements; and site fire protection water storage and pumping.

  • The next analysis we did was a high level qualitative system comparisons for select infrastructure systems, including Cogen, HVAC, UPS, and fuel storage.

SQ. FT.
575,000


LOCATION
Puerto Rico


SERVICES

Master Planning

RELATED PROJECTS OUR EXPERIENCE

bottom of page